On June 5, 1976, Teton Dam collapsed during its first filling. This case study reconstructs the interlocking design decisions that made failure inevitable: an erodible loess core pressed against cavernous volcanic rock with no filter protection, steep key-trench geometry that left stress tunnels open, and a seepage defense with zero redundancy.
"A final point is that flooding in response to seismic or other failure of the dam — probably most likely at the time of highest water — would make the flood of February 1962 look like small potatoes. Since such a flood could be anticipated, we might consider a series of strategically placed motion-picture cameras to document the process."