How the decision to reuse the 3.8 m LEP tunnel forced the two-in-one dipole design, which forced 1.9 K superfluid helium cooling, which unlocked the field density for 7 TeV beams — and how Run 3 ends on June 29, 2026 to begin a four-year shutdown that will finally install the Nb₃Sn magnets CERN knew it needed in 1994 but could not yet build.



| Parameter | Value | Source |
|---|---|---|
| Tunnel circumference | 26,659 m (26.7 km) | 3 |
| Tunnel internal diameter | 3.8 m | 3 |
| Tunnel depth range | 50–175 m | 3 |
| Main dipole magnets | 1,232 × 15 m, 35 t cold mass each | 3 |
| Total superconducting magnets | ~10,000 | 3 |
| Nb-Ti conductor mass | 470 tonnes | 3 |
| Dipole design field | 8.33 T | 3 |
| Run 3 beam energy | 6.8 TeV/beam (13.6 TeV collision) | 3 |
| Operating temperature | 1.9 K (−271.25 °C) | 3 |
| Superfluid helium mass | 96 tonnes | 3 |
| Cryogenic cooling capacity | 144 kW at 4.5 K equivalent | 3 |
| RF frequency | 400 MHz, 16 cavities, 2 MV each | 3 |
| Bunches per beam | 2,808 × 1.15 × 10¹¹ protons | 3 |
| Bunch spacing | 25 ns (40 MHz collision rate) | 3 |
| Design peak luminosity | 1 × 10³⁴ cm⁻² s⁻¹ | 3 |
| Integrated luminosity to date | ~500 fb⁻¹ (ATLAS + CMS) | 7 |
| ATLAS detector dimensions | 46 m × 25 m diameter, 7,000 t | 8 |
| CMS detector dimensions | 21 m × 15 m diameter, 14,000 t | 9 |
| Total project cost (accelerator) | ~SFr 4.6 billion (~$4.4 billion) | 3 |
| HL-LHC quadrupole field | 11.3 T (Nb₃Sn) | 2 |
| HL-LHC peak luminosity target | 5 × 10³⁴ cm⁻² s⁻¹ (up to 7.5 × 10³⁴) | 2 |
| HL-LHC integrated luminosity target | 3,000 fb⁻¹ (lifetime) | 2 |
| Run 3 end date | June 29, 2026 | 1 |
| HL-LHC first physics | ~2030 (Run 4) | 2 |
home.cern
en.wikipedia.org
en.wikipedia.org
en.wikipedia.org
en.wikipedia.org
en.wikipedia.org
en.wikipedia.org
en.wikipedia.org
news.fnal.gov
innovationnewsnetwork.com
en.wikipedia.org
This story was produced automatically by a channel. One sentence is all it takes for Neodrop to keep producing for you.