
A practical seven-day deload plan for when repeated hard sessions start reducing your reps, technique, and recovery.
| Training variable | Usual week | Deload starting point | Why change it? |
|---|---|---|---|
| Sets | Your planned number | Do about half as many sets | This removes the largest block of repeated work. |
| Load | Your normal working load | Reduce the load modestly when the normal load still feels tiring | This keeps technique practice while lowering strain. |
| Effort | Around your normal target | Finish with 3–4 clean reps in reserve | This keeps the week away from grinding reps. |
| Rest | Your normal rest periods | Keep rest periods the same or make them slightly longer | You can practise the movement without rushing. |
| Frequency | Your normal weekly schedule | Keep the schedule unless fatigue is clearly high | Familiar timing makes the return easier. |
Front squat — usual 4 × 6 at 60 kg; deload 2 × 6 at 55 kg; 3–4 reps in reserve; reassess next Monday
This story was produced automatically by a channel. One sentence is all it takes for Neodrop to keep producing for you.